Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry’s standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries, but also the leap into electronic typesetting, remaining essentially unchanged. It was popularised in the 1960s with the release of Letraset sheets containing Lorem Ipsum passages, and more recently with desktop publishing software like Aldus PageMaker including versions of Lorem Ipsum.
Pile
Load Test
Pile load test for ±320KV, 1X1000MW VSC BASED HVDC TERMINAL STATION BETWEEN KUDUS & AAREY.
Principal client-
ADANI ELECTRICITY,
MUMBAI LTD
Client – KEC
Project Cost 30 Lakh
No of Pile load test- 12
Principal client-
ADANI ELECTRICITY,
MUMBAI LTD
Client – KEC
Project Cost 30 Lakh
No of Pile load test- 12
Rock
Anchoring
Rock anchors for CONSTRUCTION PROPOSED 1500 MTDP AMMONIA PLANT TALOJA TREATED WATER RESERVOIR
Principal Client -
Deepak Fertilisers and Petrochemicals
Client – RR construction
Project Cost 63 Lakh
No. of of Rock Anchors: 1500
Principal Client -
Deepak Fertilisers and Petrochemicals
Client – RR construction
Project Cost 63 Lakh
No. of of Rock Anchors: 1500
Dynamic Load Test and Pile Integrity
Dynamic load test and pile integrity for proposed construction of residential building (G+30) "Goda Spandan', s. No. 19/2/3/4/1 p/2, besides someshwar temple, Gangapur road, tal and dist. Nashik
Client: Patil Shah Housing, Nashik
Project cost: 5 lakh
No. of dynamic pile load test: 3
(Max test load 1000 ton)
No of pile integrity : 500+ nos
Client: Patil Shah Housing, Nashik
Project cost: 5 lakh
No. of dynamic pile load test: 3
(Max test load 1000 ton)
No of pile integrity : 500+ nos
Initial Pile
Load Test
Initial Pile Load Test for Construction Of Four Lane ROB with Approaches at Titwala (KM64/30-31) Between Titwala-Khadavli Station of Mumbai Division & Construction of RUB With Approaches In Between Kopar-Bhiwandi Road Stations of Mumbai Division in Central Railway
Principal Client : MRIDC
Project cost 40+ Lakh
No of Test: 6
Max Test load : 1625 Ton
Principal Client : MRIDC
Project cost 40+ Lakh
No of Test: 6
Max Test load : 1625 Ton